NEW QUESTION 18
You want to design a plan that credits a transaction to a Position based on specific criteria such as postal codes, customer or product criteri a. Which of the following would you use in a Credit Rule? Choose the correct answer.

  • A. Territories
  • B. Formulas
  • C. Generic Attributes
  • D. Classification Rules

Answer: A

 

NEW QUESTION 19
Which of the following are characteristics of Variables? Note: There are 2 correct Answers to this question.

  • A. Variable assignments made at the Position level supersede assignments made at the Plan level.
  • B. Variable settings such as Effective Dates, Business Units, and Unit Types must NOT be the same as their associated compensation element.
  • C. A Variable can only be associated with the same type of compensation element.
  • D. Once a Variable has been created, the Variable's type can be changed.

Answer: A,C

 

NEW QUESTION 20
In SAP Commissions, what is a Fixed Value? Choose the correct answer.

  • A. An object used to store static, period-specific numbers associated with a Unit Type.
  • B. An object used to calculate complex mathematical equations.
  • C. A Classifier used to allocate transactions to Positions, based on assignment.
  • D. A placeholder for a compensation element used in a rule.

Answer: A

 

NEW QUESTION 21
Assuming that you had just uploaded an initial transaction file for a period, what Pipeline mode would provide the most complete Compensate and Pay Pipeline run? Choose the correct answer.

  • A. Specific Position
  • B. Process all transactions for all Position
  • C. Process new and modified transactions & credits for all Position
  • D. Specific Position Groups

Answer: B

 

NEW QUESTION 22
What is the purpose of a Primary Measurement rule? Choose the correct answer.

  • A. To aggregate a position assignment's credits
  • B. To calculate monthly attainment
  • C. To allocate classified transaction data
  • D. To determine the deposit amount

Answer: A

 

NEW QUESTION 23
When would you set a termination date for a Participant record? Choose the correct answer.

  • A. When a Participant changes positions
  • B. When a Participant NO longer works in an organization
  • C. When you NO longer want the commissions calculation to be processed
  • D. When you want to delete a Participant from the system

Answer: B

 

NEW QUESTION 24
Which of the following are characteristics of Calendars? Note: There are 2 correct Answers to this question.

  • A. You CANNOT delete a period once a Pipeline has been run for that period.
  • B. You can have two rules with the same names, as long as they are on different Calendars.
  • C. Leaf periods on a Calendar CANNOT contain gaps or overlap.
  • D. You can change the dates of a period after a Pipeline has been run without causing a disconnect in the results.

Answer: A,C

 

NEW QUESTION 25
What is the purpose of a Reset Data Pipeline? Choose the correct answer.

  • A. To provide a faster version of the Deferred Reset
  • B. To mark data as Reset without deleting it
  • C. To remove Pipeline data that is NO longer required
  • D. To re-run the Compensation and Pay Pipeline for the same period

Answer: C

 

NEW QUESTION 26
What is the purpose of the User Role security? Note: There are 2 correct Answers to this question.

  • A. To manage the security of the sales organization
  • B. To manage security within the system interface
  • C. To manage organizational reporting hierarchy
  • D. To manage permissions in workspaces

Answer: B,D

 

NEW QUESTION 27
What is the purpose of Excel Data Loaders? Choose the correct answer.

  • A. Data transformation
  • B. Load Plan Objects
  • C. Load Lookup and Rate Table values
  • D. Low volume data management

Answer: D

 

NEW QUESTION 28
What are some characteristics of a Position? Note: There are 2 correct Answers to this question.

  • A. A Participant can have multiple Positions at a given time.
  • B. A Position name does NOT have to be unique.
  • C. A Position CANNOT have multiple Participants at a given time.
  • D. A Position CANNOT be reused.

Answer: A,C

 

NEW QUESTION 29
Which of the following is used to aggregate deposits into one payment? Choose the correct answer.

  • A. Event Types
  • B. Earning Groups
  • C. Position Groups
  • D. Earning Codes

Answer: B

 

NEW QUESTION 30
Territories can be used in which of the following rules? Note: There are 2 correct Answers to this question.

  • A. Credit Rules
  • B. Deposit Rules
  • C. Primary Measurement Rules
  • D. Secondary Measurement Rules

Answer: A,C

 

NEW QUESTION 31
What are the characteristics of creating a version of an object? Note: There are 2 correct Answers to this question.

  • A. Once a new version is created, the previous version gets deleted.
  • B. You can track what version was effective at a particular point in time.
  • C. You CANNOT edit the previous version of an object.
  • D. The system retains previous versions for auditing purposes.

Answer: B,D

 

NEW QUESTION 32
What are the base Unit Types in the system? Note: There are 3 correct Answers to this question.

  • A. Currency
  • B. Percent
  • C. Character
  • D. Integer/Quantity
  • E. Boolean

Answer: A,B,D

 

NEW QUESTION 33
Which Workspace do you use to rename a Generic Attribute on Position records? Choose the correct answer.

  • A. Customizations
  • B. Positions
  • C. System Preferences
  • D. Position Groups

Answer: A

 

NEW QUESTION 34
What are some best practices when working with Quotas? Note: There are 2 correct Answers to this question.

  • A. Create a Variable for each Quota you want to use.
  • B. Use Quotas only when the Quota values are the same across all Positions.
  • C. Re-calculate subordinate Quotas at the manager level if you change the values of the subordinates.
  • D. Do NOT leave a Quota blank for a Position on a Plan.

Answer: C,D

 

NEW QUESTION 35
What does the system do when Payment Threshold is enabled? Choose the correct answer.

  • A. The system will NOT generate payments less than or equal to the payment threshold.
  • B. The system will NOT track negative payments as balances once the period is finalized.
  • C. The system will NOT generate payments for held deposits until they are released.
  • D. The system will NOT generate payments greater than or equal to the payment threshold.

Answer: A

 